11 April- This Week in the Barn

Great week here in Rockport.  Spring is asserting itself a bit more, though we did get four or five inches of heavy, wet snow Thursday morning.  Still, it is sunny and a balmy 43 degrees as I write this on Saturday morning.  Melting snow is running through the woods behind the house, filling the streams and flowing down to the river and into the harbor.  There are fifty and sixty degree days in the week’s forecast.  And bits of green are pushing up through the increasing spots of bare ground.

In the barn, we started things out by bringing the stems and the inwales together, then shaping the decks out of a piece of maple, and fitting and securing them in place.  Between this and the sizing of the thwarts we put in at the end of last week, the final shape of the boat (beam, bow profile, tumblehome, etc.) is determined and locked in.

IMG_1864

I build my seats from ash.  The frames are joined with mortises and tenons, then drilled for caning.  I use medium-fine cane in a traditional, six-step pattern, then bind the edges with medium cane.  This takes way too much time, but it is satisfying.

IMG_1866

The next few days were spent finishing the planking, and installing the seats and the carrying thwarts.  The hull weighs 47 1/2 pounds at this point.

IMG_1870

Now it is time to set up the shop and prep the hulls for canvassing.

IMG_1872

The crew on one of many breaks.

 

 

 

One thought on “11 April- This Week in the Barn

  1. so nice Bob. our house at the dead end road by the creek had a whole grove of ash trees….wish we could bring you a load so U. Larry could see your shavings. That’s what he always says he’s making in the shop when I ask him what he’s doing down there. Then eventually he brings something beautiful to the house.

    Like

Leave a comment